Job Description
Need Smart Hands / Network Field Engineers
Resources should have experience in rack & stack, cabling, WLC installations, fiber connectivity, and remote support coordination.
Primary Onsite Work Stage equipment before cutover.
Install 2 Cisco 9800 WLCs per site.
Perform power/network cross-connects, including verifying switchport availability for WLC connections.
Install/connect required SFPs, fiber patch cords, and Ethernet patch cords as per site requirement.
Support remote team during cutover and validate installation.
Remove old WLCs, label, pack, and prepare for return shipment.
Deployment Scope Tools / Material Readiness Engineers should have console cable, hotspot, label maker, rack screws, and be prepared with/verify required SFP modules, fiber patch cords, and Ethernet patch cords per site.
Additional Recruitment Note: Prefer engineers with network implementation / cabling / smart hands background ...
Resources should have experience in rack & stack, cabling, WLC installations, fiber connectivity, and remote support coordination.
Primary Onsite Work Stage equipment before cutover.
Install 2 Cisco 9800 WLCs per site.
Perform power/network cross-connects, including verifying switchport availability for WLC connections.
Install/connect required SFPs, fiber patch cords, and Ethernet patch cords as per site requirement.
Support remote team during cutover and validate installation.
Remove old WLCs, label, pack, and prepare for return shipment.
Deployment Scope Tools / Material Readiness Engineers should have console cable, hotspot, label maker, rack screws, and be prepared with/verify required SFP modules, fiber patch cords, and Ethernet patch cords per site.
Additional Recruitment Note: Prefer engineers with network implementation / cabling / smart hands background ...
Apply for this Position
Ready to join Tech People 247? Click the button below to submit your application.
Submit Application