Job Description

Contexte et environnement

Green Field Project, Tilenga is a remote location in UGANDA near Albert Lake with particular sensitive environmental conditions. Huge onshore challenging project: heavy and waxy oils produced from 31 drilling pads, (with some of them located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bold of water treatment capacity. Reservoir pressure maintenance is ensured either by water injection or by polymer water injection depending on the

reservoir’s characteristics. The project also includes an extended interconnecting network with temperature preservation. Multicultural environment: Contractors are anticipated to be located in various parts of the world. Ugandan rules and

regulations, administrative requirements, and technical authorizations as well as international codes for onshore plant will apply.

Activités

Main Duties and Respo...

Apply for this Position

Ready to join TotalEnergies EP Uganda? Click the button below to submit your application.

Submit Application