Job Description
The MPS leader is responsible for developing and optimizing the Master Production Schedule (MPS) and Material Requirements Plan (MRP) for the Support Systems orderbook in India. This role will ensure that engineering deliverables, material receipts, fabricators and our operations teams are synchronised to meet our delivery requirements.
•Integrated Scheduling: Develop a feasible, project-based MPS to meet customer delivery requirements whilst negotiating the challenges of Engineer to Order manufacturing i.e. engineering approvals, material availability and fabricator resources
•Process Ownership: Manage the MPS process for Support Systems, drive weekly/bi-weekly meetings to increase schedule adherence, resolve issues with the plan, measure the performance and drive improvements
•Material Requirements Planning: Execute MRP to ensure long-lead components and raw materials are ordered in alignment with timely engineering releases to avoid p...
Apply for this Position
Ready to join John Crane? Click the button below to submit your application.
Submit Application