Job Description


Would you like to work for an inclusive and collaborative company which is also one of the most successful within the UK infrastructure industry?


Metrowest 1b Scheme – Portishead to Bristol Temple Meads


Role Overview


The Metrowest 1b scheme will reinstate passenger rail services between Portishead and Bristol Temple Meads, improving regional connectivity and supporting sustainable transport.
This £80m programme includes:


 



  • Construction of 4.5 km of disused railway between Pill and Portishead

  • New stations at Pill and Portishead

  • Highways and utility works

  • Rock stabilisation and drainage

  • Bridges, retaining walls, and other lineside civils
    Delivery is planned from January 2026 to mid-2028 in collaboration with Network Rail.


 


Role Responsibilities

Apply for this Position

Ready to join Morgan Sindall Infrastructure? Click the button below to submit your application.

Submit Application