Job Description
Would you like to work for an inclusive and collaborative company which is also one of the most successful within the UK infrastructure industry?
Metrowest 1b Scheme – Portishead to Bristol Temple Meads
Role Overview
The Metrowest 1b scheme will reinstate passenger rail services between Portishead and Bristol Temple Meads, improving regional connectivity and supporting sustainable transport.
This £80m programme includes:
- Construction of 4.5 km of disused railway between Pill and Portishead
- New stations at Pill and Portishead
- Highways and utility works
- Rock stabilisation and drainage
- Bridges, retaining walls, and other lineside civils
Delivery is planned from January 2026 to mid-2028 in collaboration with Network Rail.
Role Responsibilities
Apply for this Position
Ready to join Morgan Sindall Infrastructure? Click the button below to submit your application.
Submit Application