Job Description

Responsible for co-ordinate welder performance Qualification test, welding procedures qualification test & preparing the welding procedure record(WPQR).



1.2 Witnessing the entire destructive and nondestructive testing requirement of welding procedure, as per code and standards, ASME Section IX,AWS D1.1



1.3 Provide training to the site personnel regarding implementation of the construction quality control program and training to the welders and welding supervisors as per approve welding procedure specification (WPS) Prior for the welders qualification test (WQT) and to be certified and accepted by the classification society ABS,LR,GL,BV and others.



1.4 Using FCAW, process 6G position uphill. Base material SPEC.ASTM A-106 Sched 80 carbon steel pipe, filler metals AWS5.2 E-71T-1(1.2mm ESAB)



1.5 Using SMAW, process 6G position uphill. Base API 5L sched. 80 carbon steel pipe, Filler metals AWS A5.1 E7018 (3.2mm ESAB)

Apply for this Position

Ready to join Subic Drydock Corporation? Click the button below to submit your application.

Submit Application