Senior Project Engineer – Electrical

ACCIONA is a global company leading in regenerative infrastructure. We are building the Central‑West Orana Renewable Energy Zone (REZ) transmission network with new high‑capacity lines and energy hubs. The project will be operational by 2028 and unlock up to 4.5 GW of new network capacity.

Overview

ACEROZ, a partnership of ACCIONA, COBRA and Endeavour Energy, has been appointed network operator by EnergyCo to design, build, finance, operate and maintain the Central‑West Orana REZ transmission network. The project consists of 90 km of 500 kV overhead transmission lines and 150 km of 330 kV lines from Elong Elong to Barigan Creek via an energy hub at Merotherie.

Key Responsibilities

  • Provide leadership to subcontractors, monitor and control performance, and ensure quality standards in accordance with specifications.
  • Drive commitment to quality both top‑down and bott...