Job Description
Having experience and depth knowledge in -
Construction Planning & Coordination, Execution, Design Review, Resource Management, Quality Assurance, Safety Management, Progress Monitoring, Interface Management, Client Co-ordination, Documentation and Problem Solving for Achieving Contractual Milestone Dates for -
Installation, testing & commissioning of 66kV /132kV/220kV Gas Insulated Substation (GIS) and Air Insulated Substation (AIS), Distribution substations(11kV/22kV/33kV) i.e., Auxiliary & Main Sub-station. Installation of all Electrical Heavy Equipments i.e., Transformers (Power & Distribution), HT Boards, CT, PT, CRP, SCADA (RTU), LT Panel, Bus duct, ACDB, DCDB, Battery Bank, Battery charger, Compact Sub-station, DG up to 1.5 MVA. EHV(66kV) & MV(11kV) cable laying, different type of jointing works (Straight through Joint, End Termination Joint at GIS/HT Board/Transformer Primary Side) LT Power & Control cable laying & Termination works Complete Illumination works from Building Indoor, Outdoor, Street light & High Mast , GI conduiting works in slab & wall, Wiring, Fixture & Socket installation Fire detection, Alarm and Gas flooding arrangement system with interfacing with third part system(SCADA) HVAC System with VRF/VRV for Large Scale Building Access control and PIDS System EOT crane installation works PHE works (Rainwater harvesting and Plumbing works) Cable Tray Installation with Support Angle and different type of bend for Cable Laying Works Complete Grid Earthing Works using Copper/MS Conductor using exothermic welding for different types of Cross-Joint, T-Joint, L-Joint, Tap-off for riser for Equipment earthing. Complete Building Lightning Protection Works with suitable spike arrangement/surge arrester. Overhead MV/LV cable laying works on viaduct in any Metro/Railway Project using Mechanized arrangement i.e Winch Machine.
Apply for this Position
Ready to join ? Click the button below to submit your application.
Submit Application