Job Description

KRAs

  • As per mouza respect project boundary line demarcation.
  • Project area spot level taken and contour drawing prepared.
  • Topographical survey or detailing survey in projects area.
  • Building block layout marking respect architect GFC drawing and architect checking.
  • Hardscape area layout of part wise.
  • Pile layout plan incorporate of block co-ordinate plan drawing and pile point marking of the field.
  • All Service line and MEP layout of the field as per drawing.
  • Building column position and grid line marked by TOTAL STATION Machine.
  • Invert level marked of the PHE Work purpose and Project as build drawing prepared.
  • Building slab height checking and level marking per floor.

Requirements

Must-have Skills:

Survey Instrument Auto Level, Leaser Level & Total Station Machine

Must h...

Apply for this Position

Ready to join DTC Group? Click the button below to submit your application.

Submit Application